Sharp R-95STM Spécifications Page 37

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 91
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 36
Setup
ProtoMat 95s/II 37
fig. 23:
› Right-click on the project.
fig. 24:
The PLACEMENT dialogue box opens. Specify the position in the
ORIGIN POINT box as x=0, y=0 and confirm by clicking on OK.
› Select the
DRILLINGPLATED
process from the production phase
list box.
Click on and enclose the first hole by clicking and dragging with
the left mouse button.
› Now enable the selected hole for machining by clicking and
START
. The hole is drilled in the board once the tool has been
changed for the specified drill.
› Next move to the PAUSE position and rotate the board about the x-
axis.
Vue de la page 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 90 91

Commentaires sur ces manuels

Pas de commentaire