Sharp 21F-A30 Manuel de l'opérateur Page 132

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 192
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 131
MAINTENANCE AND SERVICING
Form 169000 / 169040 130 Revision C
7.8.9.3 Installation: A30-S Sickle Drive Belt
a. Route sickle drive belt (A) through opening in
end sheet onto wobble box pulley and sickle
drive pulley (E) as shown.
NOTE
When installing new belt, never pry belt
over pulley. Be sure idler is fully
loosened, then tension belt.
b. Turn adjuster bolt (C) to move idler until a force
of 20 lbf (80 N) deflects belt (A) 1/4 in. (6 mm) at
mid-span.
c. Tighten idler bolt (B).
d. Position belts (F) on pulley (G) as shown.
e. Turn adjuster bolt (H) so that each belt deflects
3/16 in. (4 mm) at mid-span when a load of
8 - 12 lbf (35 - 40 N) is applied to each belt.
f. Tighten bolts (J) and jam-nut on (H).
g. Install bolt-in plate in LH end sheet at wobble
box, and close endshield.
h. Re-adjust tension of a new belt after a short
run-in period, (about 5 hours).
C
B
E
A
G
F
H
J
Vue de la page 131
1 2 ... 127 128 129 130 131 132 133 134 135 136 137 ... 191 192

Commentaires sur ces manuels

Pas de commentaire