Sharp AR-C240P Guide d'installation Page 4

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 3
4
Network Installation
Install the Ferrite Core
Important!
In order to reduce electromagnetic interference—noise” that interferes with TVs or other appliances—you must place the
enclosed ferrite core on the network cable connected to your printer.
This safeguard is an FCC requirement.
Here's how to do it:
Disconnect the network cable from the printer, if necessary.
Loop the cable if necessary to keep the ferrite core in place.
Place the open core about 1 inch from the cable connector on the printer end.
Press the two halves of the core together until they click shut.
ferrot_puggedin.eps
Vue de la page 3
1 2 3 4 5 6 7 8 9 ... 19 20

Commentaires sur ces manuels

Pas de commentaire